View Single Post
mb911 mb911 is offline
Registered User
 
Join Date: Jan 2003
Location: Burlington, Wisconsin
Posts: 9,199
the later part of this week I will probably start the project I have to finish up Brians project first then move on to the 993HE setup

I have thought out a bunch of it already so this project should work well with the exception of the flange and keeping the banks seperated all the way to the flange. it would actually be easier to not do that

Paul (911nut) which way were you thinking of going?
__________________
Ben

Current project 73 914-6 Gt project rusteration 2.4
Reproduction 914-6 oil tanks, 1-5/8" 914-6 heat exchangers source call 2623647426 or email mbconsulting21 @gmail.com
Old 12-15-2008, 10:07 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #33 (permalink)