had a good experience with CL contractor today

When you are out of your element it's difficult to find a contractor to do a job with any degree of confidence. How do you know the guy is legit ? Anyway recently I decided I need a 12 x 20 pad poured for my RV and a 5 x 18 sidewalk. I decided to look on Craigslist to see what was available for concrete contractors. Being near Atlanta there was a boat load. Not sure what my process was but I narrowed it down to three guys. Basically picked on phone conversations and he was the only one to come out and see the job. Well today 5 yards of concrete were poured and I couldn't be happier. The two guys that did the job were on time, spoke English and had EVERYTHING with them to do the job. The 12 x 20 pad averaged 5 " thick and the 5 x 18 sidewalk average 4 " thick. The concrete mix was 3000 psi with fiberglass added and the total price was 1300.00. I think I did good.

__________________
2002 Boxster S . Arctic silver + black top/int. Jake Raby 3.6 SS engine " the beast ". GT3 front bumper, GT3 side skirts and GT3 TEK rear diffuser. 1999 996 C4 coupe black/grey with FSI 3.8 engine . Rear diffuser , front spoiler lip with ducktail spoiler .
Old 08-29-2014, 01:31 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #1 (permalink)
Navin Johnson
 
TimT's Avatar
 
Join Date: Mar 2002
Location: Wantagh, NY
Posts: 8,818
That's a pretty good price for flat work near a large city... In the NYC area price for sidewalks/slabs is closer to $7.00 sf...

Now go out and cure the slabs properly, mist them with water.... or better let a sprinkler keep the slabs wet for a a few days..

Or cover the slabs with opaque plastic and have a soaker hose under the plastic running a slow drip..

You want the concrete to be cured..."wet" for a few days... State and Federal specs usually require wet curing of slabs for 7-14 days...

Or just keep the slab as wet as possible. for you... In the long run its better

__________________
Don't feed the trolls. Don't quote the trolls
http://www.southshoreperformanceny.com
'69 911 GT-5
'75 914 GT-3
and others
Old 08-29-2014, 02:16 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #2 (permalink)
Reply


 


All times are GMT -8. The time now is 01:39 AM.


 
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website -    DMCA Registered Agent Contact Page
 

DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.