|
|
|
|
|
|
Registered
|
rebuilding after a wildfire. i'm hearing $550 per sq foot!
my coworkers first rough quote. $550!!
damn..that is a lot? what does a standard "hey i want a new house built here!" cost? $350? my coworker has..no HAD a big house. 4000 sqft +. the final product would cost more than it's worth i think.. gouging?
__________________
poof! gone |
||
|
|
|
|
Registered
|
$500 is about 4 times what we would pay here in Ohio.
__________________
. |
||
|
|
|
|
Registered
Join Date: Oct 2004
Location: CA
Posts: 5,888
|
I recently revised my homeowner's insurance post North CA fires, and the StateFarm lady said the default policy was around $350/sqft, which seemed low for Marin (and sonoma/Napa). I bumped that to $450 per sqft for an extra $200 a year. $550 seems like gouging to me, but how are you gonna avoid gouging there and now ? Finding a contractor in the north bay was hard before the fire, imagine now !
|
||
|
|
|
|
The Unsettler
|
$550 per sq ft?
Ouch A 1/4 of that around here.
__________________
"I want my two dollars" "Goodbye and thanks for the fish" "Proud Member and Supporter of the YWL" "Brandon Won" |
||
|
|
|
|
Registered
|
I expect that may not be true after Harvey. The weather events 1000s of miles away have even affected us here in Ohio. Nobody is discounting the price of building materials. I had to pay almost $300 more for a whole house generator last week than my neighbor paid for the same model generator installed by the same contractor in May.
edit: I just found out my regular concrete contractor who gave me an "I don't want to do that job but thanks for asking" bid on a little job here took his crew and his truck and left for Texas Nov. 1.
__________________
. Last edited by wdfifteen; 11-02-2017 at 11:28 AM.. |
||
|
|
|
|
?
Join Date: Apr 2002
Posts: 30,683
|
I'll take a roomy 10'x10' McShed
....
|
||
|
|
|
|
|
Registered
Join Date: Jan 2012
Location: NW Ohio
Posts: 9,733
|
Be part of the tiny house nation, or buy a sailboat, either way $550 a sf is highway robbery, and taking advantage of a bad situation.
|
||
|
|
|
|
Registered
Join Date: Mar 2004
Location: Los Angeles
Posts: 17,503
|
That's a lot, but a 4000' house is a custom job. Hill side? Its about 450 for hill side down here. Again, there's a lot of of variables.
|
||
|
|
|
|
Registered
Join Date: Sep 2007
Location: Ventura County, CA
Posts: 4,018
|
Here in Ventura County, CA, you can build from dirt, foundation up, with granite, hardwood floors, and first class fixtures for $400-$450 per sq. $550 is profiteering off the disaster IMHO. Contractors are good at that when business is in demand.
__________________
Craig T Volvo V60 - Daily Driver (I love it!) 997 Turbo - FVD Exhaust, GIAC Tune - 542 dyno hp on 93 oct 1972 Chevy K-10 Pick-Up Truck Hugger Orange
|
||
|
|
|
|
Registered
Join Date: Aug 2000
Location: Palm Beach, Florida, USA
Posts: 7,713
|
Those are Beverly Hills/Palm Beach mansion construction numbers. Out here the most expensive you could build without getting crazy would be in the $350, and that would be the absolute top end.
__________________
MRM 1994 Carrera |
||
|
|
|
|
Team California
|
Quote:
Quote:
I'd think you could go easily higher than $350 in Kenwood or Wayzata w an expensive architect, etc. Maybe that's what you mean by "getting crazy".
__________________
Denis |
||
|
|
|
|
(the shotguns)
Join Date: Feb 2006
Location: Maryland
Posts: 21,909
|
That is criminal.
Sent from my iPhone using Tapatalk
__________________
***************************************** Well i had #6 adjusted perfectly but then just before i tightened it a butterfly in Zimbabwe farted and now i have to start all over again! I believe we all make mistakes but I will not validate your poor choices and/or perversions and subsidize the results your actions. |
||
|
|
|
|
Registered
Join Date: Oct 2004
Location: CA
Posts: 5,888
|
While I agree with the sentiment, I don't know. It might be criminal if the normal cost was 200 and they charge 550. But in that area, per my insurance the cost is about 450 normally... A jump of 20% considering the extent of the demand and scarcity of the offer is kinda consistent with capitalism... There was a great scarcity of housing there to begin with, and very few builders - trust me I've been doing work recently, PITA to find someone not already busy BEFORE the fires...
Honestly qualified builders should get their CA licensing and come build here - my neighbor's dad is doing just that (not to defraud people, to work!). They might hate all the hoops they have to jump through... But there is a demand for sure ! It might also help lower costs... Last edited by Deschodt; 11-02-2017 at 02:13 PM.. |
||
|
|
|
|
Registered
Join Date: Feb 2000
Location: Dallas, TX
Posts: 4,612
|
I read that construction costs have gone up at least 10% in North Texas due to immigration scares. Between high demand and not enough workers, things can't get built as fast here. Our house was about $200 per sq ft.
__________________
Neil '73 911S targa |
||
|
|
|
|
Registered
Join Date: Jul 2001
Location: Denver Area
Posts: 1,017
|
I'm really surprised that no one has gone after these people for price gouging. I was helping my brother with some work and he told me that on average everything has gone up by a factor of 3x at Lower, Home Depot, etc. And the supplies we bought are junk. Stuff you normally would not purchase or ever see on a shelf due to lack of quality.
I'm all for supply and demand and a free economy but if you look at the supply chain, someone is price gouging.
__________________
Grady aka plain fan 66 912 - enjoying the good life 78 911 SC and 90 C2 turbo look cab - gone but not forgotten 01 996 TT - ![]() 09 Audi A4 Avant - daily driver |
||
|
|
|
|
83 911 Production Cab #10
|
Time to sell the land and move
__________________
Who Will Live... Will See ![]() ![]() ![]() 83 911 Production Cab #10, Slightly Modified: Unslanted, 3.2, PMO EFI, TECgt, CE 911 CAM Sync / Pulley / Wires, SSI, Dansk Sport 2/2, 17" Euromeister, CKO GT3 Seats, Going SOK Super Charger Last edited by JJ 911SC; 11-02-2017 at 03:38 PM.. |
||
|
|
|
|
83 911 Production Cab #10
|
Ours was $100 per sq ft. (2000 S.F. custom bungalow on a 2 acre lot 15 minutes from downtown) back in 1996. But now the resale value is $400 per sq ft.
No matter how hight it goes, next move is "feet first" ![]() ![]()
__________________
Who Will Live... Will See ![]() ![]() ![]() 83 911 Production Cab #10, Slightly Modified: Unslanted, 3.2, PMO EFI, TECgt, CE 911 CAM Sync / Pulley / Wires, SSI, Dansk Sport 2/2, 17" Euromeister, CKO GT3 Seats, Going SOK Super Charger |
||
|
|
|
|
Registered
Join Date: Mar 2004
Location: Los Angeles
Posts: 17,503
|
Quote:
|
||
|
|
|
|
|
Registered
Join Date: Dec 2007
Posts: 6,275
|
Anyone have any experience with those prefab houses.
Where they bring in the framed walls on a truck. |
||
|
|
|
|
Registered
Join Date: Mar 2004
Location: Los Angeles
Posts: 17,503
|
Depending who's doing the framing on site, most framers are a little sloppy with their work. Prefab homes are fabricated in a very controlled environment, so they are often square and fit very well on site unless the pad is screwed up then it will throw everything out of square. It can be fixed, but will take a little time. That depends on the crew if they really want to spend the time to get it dialed in.
I don't know enough about them, I think a semi custom home can be had. |
||
|
|
|