![]() |
Project Orange has reached substantial completion
I got the car at the end of January COMPLETELY disassembled by the PO. 21 plastic tubs and various interior parts were stored in my dining room with the big stuff in the garage. In March the shell went to the body shop for light rust removal, panel straightening, and paint. I cleaned & prepped parts for 4 months while the shell was at the body shop. The link below is a 2 minute "video" from stills from a camera in the corner of my garage. 14 weeks to reassemble and get it on the road. I still have some interior work to finish and a few electrical issues to work out, but it is on the road!
http://youtu.be/jdAfthsg5Bg |
"Video does not exist."
|
I changed it and it works. at least it just did.
|
Quote:
|
Great video & fantastic car!
I love orange on a 911. |
Nice!
|
Very nicely done build.
|
Very nice, is it Continental Orange? I went through similar experience last year, painted with glass out but engine in.
|
Quote:
|
All times are GMT -8. The time now is 02:58 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website