They have I-74 torn up for 30+ miles between Bloomington and Peoria. With the way the state of Illinois does road work, I expect it to be done sometime in 2020.
I got to thinking, does anyone make a continuous road resurfacer? I'm thinking like a series of machines that can be trucked in and hooked up. The first one grinds up the road surface, the second one picks up the debris and grinds it up further, the third one heats up the ground up debris and injects tar, the fourth one lays down the newly rejuvenated road surface, and on the end is a steam roller the width of the road surface laid down. Seems like several miles could be done in a day this way rather that over months/years.
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." Last edited by legion; 08-06-2018 at 08:12 PM.. |
||
|
|
|
|
Registered
|
I’ll be the first one to nominate Prius’s to be the ground up debris.
|
||
|
|
|
|
Registered
Join Date: May 2004
Location: Lake Cle Elum - Eastern WA.
Posts: 8,417
|
![]() My memories when passing thru.........
__________________
Bob S. 73.5 911T 1969 911T Coo' pay (one owner) 1960 Mercedes 190SL 1962 XKE Roadster (sold) - 13 motorcycles |
||
|
|
|
|
Preferred pronoun:Maestro
Join Date: Sep 2012
Location: Group W Bench
Posts: 11,351
|
Google "Bomag".
_
__________________
When in doubt, use overwhelming force. |
||
|
|
|
|
Registered
Join Date: Jun 2017
Location: Michigan
Posts: 781
|
|
||
|
|
|
|
Registered
Join Date: Jun 2000
Location: bottom left corner of the world
Posts: 22,872
|
Discriminating.
Discriminating against the guys who lean on a shovel all day. The union wouldn't allow it. "Hello Head Office, this is Road Works Gang - We've run out of shovels." "Hello Road Works Gang. Tell the guys to lean against eachother." |
||
|
|
|
|
|
Registered
Join Date: Aug 2015
Location: Pacific Northwest
Posts: 2,451
|
Not Asphalt but pavers
|
||
|
|
|
|
canna change law physics
|
Quote:
__________________
James The pessimist complains about the wind; the optimist expects it to change; the engineer adjusts the sails.- William Arthur Ward (1921-1994) Red-beard for President, 2020 |
||
|
|
|
|
"O"man(are we in trouble)
Join Date: Nov 2005
Location: On the edge
Posts: 16,452
|
I don't think the surface lasts very long!
|
||
|
|
|
|
Get off my lawn!
|
Quote:
Kingfisher has had real issues with road flooding for along time. In a flooding event, there are few other options to get in or out of town without that highway.
__________________
Glen 49 Year member of the Porsche Club of America 1985 911 Carrera; 2017 Macan 1986 El Camino with Fuel Injected 350 Crate Engine My Motto: I will never be too old to have a happy childhood! |
||
|
|
|
|
The Stick
|
With all of the standards, etc. that are supposed to make the road better and smooth, that make it take so long to re-do, the road doesn't seem any smoother after they finish anyway.
__________________
Richard aka "The Stick" 06 Cayenne S Titanium Edition |
||
|
|
|
|
Wildman Emeritus
Join Date: Feb 2003
Location: Chitown Burbs
Posts: 1,882
|
Chris;
Somehow the length of road projects here must be Rauner's fault. I'll bet JB could have it done in a week. Hopefully, with the newer method of laying asphalt and concrete on top of that, the roads will last longer than previously. I 90 seems to be holding up well but it did take 3 years to get done.
__________________
Mike Andrew 1980 SCWDP 2024 Suby Forester 2018 BMW X1- Wife's 2000 Boxter - Sold |
||
|
|
|
|
Registered
Join Date: Mar 2004
Location: Higgs Field
Posts: 22,765
|
I went on a motorcycle road trip around our Olympic Peninsula with three buddies just two weeks ago. We hit a paving project around Crescent Lake that was being done the traditional way. When we went up Hurricane Ridge, however, we ran across another paving project, and they were using just such a machine. It lifted off and ground up the old asphalt on its leading end, dumping it all into a big hopper. On the trailing end, it mixed the ground asphalt with new tar and laid it down. Couple of steamrollers following it and, ta da - new road. Pretty cool.
__________________
Jeff '72 911T 3.0 MFI '93 Ducati 900 Super Sport "God invented whiskey so the Irish wouldn't rule the world" |
||
|
|
|
|
Get off my lawn!
|
I have lived in the OKC metro area for 40 years. In all that time there has been construction on I-35 south of OKC down to Norman, OK. My theory is there just two brothers, doing the work. They take off and do other projects and keep coming back to the I-35 project. After 40 years they have added several lanes to most of the interstate, and several new overpasses. It is admittedly much improved, but dang 40 years and they are still building.
And in the 40 years I have made just one round trip up to Tulsa (about 95 miles) and NOT had construction. It is the construction company annuity fund.
__________________
Glen 49 Year member of the Porsche Club of America 1985 911 Carrera; 2017 Macan 1986 El Camino with Fuel Injected 350 Crate Engine My Motto: I will never be too old to have a happy childhood! |
||
|
|
|
|
Registered
|
These machines have been around for a while. The one major issue with the new surface is it can be too smooth, because the original aggregate has been ground up. So sometimes new aggregate (the little sharp stones in the mix) is added to make the surface meet the required standards for the surface friction it can provide on rainy days (no slippery when wet signs).
|
||
|
|
|
|
Cars & Coffee Killer
Join Date: Sep 2004
Location: State of Failure
Posts: 32,246
|
Bob: Thanks for the contribution!
![]() p911dad: I don't see an issue with adding in some sharper aggregate to the mix. redbeard: They don't seem to be doing anything with the road bed. They are grinding it down a few inches and repaving, just taking a really long time to do it. Mike: It's been this way my whole 28 years in Illinois. I love it when they put down the cones 2 weeks - 1 month before any work starts, at a minimum of 2 miles before the work zone. In Georgia, they seemed to figure out how to put out cones the day work start and pick them up the day it ends.
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." |
||
|
|
|
|
Get off my lawn!
|
I am convinced that many states do not have a storage facility for cones. They put them out and just store them on the side of the road in a "construction" zone and reduce the speed limit. That way they can write expensive tickets for speeding in a construction zone, even though there is not one piece of operational equipment or a single worker anywhere. Just a great place to put cones.
__________________
Glen 49 Year member of the Porsche Club of America 1985 911 Carrera; 2017 Macan 1986 El Camino with Fuel Injected 350 Crate Engine My Motto: I will never be too old to have a happy childhood! |
||
|
|
|
|
83 911 Production Cab #10
|
That was the best one... Gray & Houseman Road Construction Vehicle | Thunderbirds Wiki | FANDOM powered by Wikia
![]()
__________________
Who Will Live... Will See ![]() ![]() ![]() 83 911 Production Cab #10, Slightly Modified: Unslanted, 3.2, PMO EFI, TECgt, CE 911 CAM Sync / Pulley / Wires, SSI, Dansk Sport 2/2, 17" Euromeister, CKO GT3 Seats, Going SOK Super Charger |
||
|
|
|
|
|
Blockchain Tech Inventor
Join Date: Jan 1999
Location: US fn A!
Posts: 1,569
|
Bessie
__________________
A Mean Green Lifted 1972 C10 Long live the king! |
||
|
|
|
|
Registered
Join Date: May 2012
Location: ORD
Posts: 359
|
Quote:
![]() Notice how the radar vans have vanished from constriction zones? Why are the highways leaving our state, smooth? LMAO. It's also smooth, going home. Our politicians did this to us.
|
||
|
|
|