The Myth or Truth Behind the $20,000 Wrench
I've been trying to find the truth and reasons behind those expensive items that the Government, NASA or the Military has bought. Anybody have any real data as to the breakdown of why items from wrenchs to toilet seats are so expensive (if they really are)?
__________________
Michael D. Holloway https://simple.m.wikipedia.org/wiki/Michael_D._Holloway https://5thorderindustry.com/ https://www.amazon.com/s?k=michael+d+holloway&crid=3AWD8RUVY3E2F&sprefix= michael+d+holloway%2Caps%2C136&ref=nb_sb_noss_1 |
||
![]() |
|
Registered
Join Date: Aug 2006
Location: SoFLA
Posts: 5,536
|
"In 2004 Senator Chuck Grassley (R Iowa) said: "I exposed the spending scandal in the ‘80s when federal bureaucrats saw no problem in spending $600 for a toilet seat . . .". Some now claim that neither that nor his also famous revelation of the Pentagon spending $400 for a hammer actually ever happened. Others say the prices paid were fair and justifiable.
The $600 dollar toilet seat was determined to be "fair and reasonable" by a Naval Contracting Officer, based on his detailed knowledge of the manufacturing processes and degree of effort known to be required from the vendor, to manufacture this item. The United States military services are often in the position of making equipment last decades longer than originally designed. For example the B-52 bomber is more than 50 years old and expected to be useful for another 20 years. The famous toilet seat came about when about twenty Navy planes had to be rebuilt to extend their service life. The onboard toilets required a uniquely shaped fiberglass piece that had to satisfy specifications for the vibration resistance, weight, and durability. The molds had to be specially made as it had been decades since the planes original production. The price of the "seats" reflected the design work and the cost of the equipment to manufacture them. The problem arose because the top level drawing for the toilet assembly referred to the part being purchased as a "Toilet Seat" instead of its proper nomenclature of "Shroud". The Navy had made a conscious decision at the time, not to pay the OEM of the aircraft the thousands of dollars it would take to update their top level drawing in order to fix this mistake in nomenclature. Later some unknown Senate staffer combing lists of military purchases for the Golden Fleece Awards found "Toilet Seat - $600" and trumpeted it to the news media as an example of "government waste." The Senate then wrote into the appropriations bill that this item would not be purchased for anything more than $140.00. The shroud has never been purchased since, as no one can make the shroud at that price. President Reagan had actually held a televised news conference, where he held up one of these shrouds. During the press conference, he explained the true story. The media of the time, and still today, incorrectly reports that the Pentagon was paying $640.00 for a $12.00 toilet seat. " |
||
![]() |
|
Registered
Join Date: Apr 2001
Location: Linn County, Oregon
Posts: 48,503
|
Ever heard of skunkworks? They have to hide the money spent somehow...
__________________
"Now, to put a water-cooled engine in the rear and to have a radiator in the front, that's not very intelligent." -Ferry Porsche (PANO, Oct. '73) (I, Paul D. have loved this quote since 1973. It will remain as long as I post here.) |
||
![]() |
|
Registered
Join Date: Jan 2003
Location: the beach
Posts: 5,148
|
When I worked for the Federal Government, (the USGS) we had to fill out forms for every piece of equipment, and list three manufacturers and their prices. It was hard to get permission to buy anything other than the cheapest item. In short, is was very hard to overspend.
__________________
Charlie 1966 912 Polo Red 1950 VW Bug 1983 VW Westfalia; 1989 VW Syncro Tristar Doka |
||
![]() |
|
sudo apt-get purge 930
Join Date: Jul 2006
Location: Brandon, FL
Posts: 4,838
|
It's probably a Snap-On.
__________________
Mark 1979 930 Euro ***GONE AND DON'T MISS IT AT ALL*** "Worrying about depreciation on your car and keeping mileage down is like not ****ing your girlfriend so her next boyfriend finds her more appealing" --clutch-monkey |
||
![]() |
|
Registered
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,258
|
I used to work at a composite R&D fabricator as the business manager and therefore was responsible for billing. Did a lot of DoD work, made some intakes for the stealth bomber, tubes for the Army, towline for the Navy.
After close to a year of learning government cost accounting and regulations, I learned that you can bill the government anything, and if you do it the right way, they will pay anything. Gave cost+ a new meaning.
__________________
Tru6 Restoration & Design |
||
![]() |
|
![]() |
Unfair and Unbalanced
Join Date: Jul 2004
Location: From the misty mountains to the bayou country
Posts: 9,711
|
Have you ever looked at govt specs? When a toilet seat has 22 pages of specs that you must meet or you wont get paid, the price goes up. Still, the problem is bureaucratic morons. Sometime the contractors score too but not always. The taxpayer always gets shafted.
__________________
"SARAH'S INSIDE Obama's head!!!! He doesn't know whether to defacate or wind his watch!!!!" ~ Dennis Miller! |
||
![]() |
|
Registered
Join Date: Aug 2000
Location: Palm Beach, Florida, USA
Posts: 7,713
|
The government pays certain jobs on a cost plus basis - the cost of the item plus a reasonable markup. The reason the prices are so high is the MFG is being allowed to allocate their depreciation expense for their equipment equally to each item they sell. Therefore a wrench "costs" $500 to make. The rationale behind it is that it is necessary to keep a consistent supply of product manufacturers on line, through good times and bad.
The theory is that if the government relied exclusively on the open market for their product and suddenly had a crisis where they needed more product than the open market manufactured on a regular basis they would be stuck.
__________________
MRM 1994 Carrera |
||
![]() |
|
Virginia Rocks!
Join Date: Oct 2003
Location: Just outside the beltway
Posts: 8,497
|
Quote:
Yup. And to you and I, the toilet seat is a toilet seat like we'd get for 11.99 at Home Depot, but there's usually something special about it that can't be explained in a soundbite or a headline. I paid $40 for a wrench from this site, hard to explain that succinctly either. ![]()
__________________
Rosewood 1983 911 SC Targa | Black 1990 944 S2 | White 1980 BMW R65 | Past: Crystal 1986 944 na Guards Red is for the Unoriginal
|
||
![]() |
|
Cars & Coffee Killer
Join Date: Sep 2004
Location: State of Failure
Posts: 32,246
|
So far, I've heard three theories on why some things cost the government so much:
1) It's a way to hide secret programs. 2) The government often has unduly complicated requirements. 3) Vendors screw the government (taxpayers, really). I'm willing to believe that all three are at play in varying degrees on various items. Let's face it: 1) The government has a need to hide certain things that cost a lost of money. 2) A toilet on a nuclear submarine might have some unique requirements. Sometimes bureaucrats like to create complexity to justify their jobs too. 3) There are unscrupulous companies in every business. (Not saying that excuses them.)
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." |
||
![]() |
|
Virginia Rocks!
Join Date: Oct 2003
Location: Just outside the beltway
Posts: 8,497
|
The money that needs to be hiddin, is hidden at the beginning of the process. You don't need to create ways like this to hide it.
![]()
__________________
Rosewood 1983 911 SC Targa | Black 1990 944 S2 | White 1980 BMW R65 | Past: Crystal 1986 944 na Guards Red is for the Unoriginal
|
||
![]() |
|
Registered
Join Date: Jul 2004
Location: Maryland
Posts: 31,409
|
Where to start.
I am a program manger for the Navy...I procure all Unmanned Air Systems for the Navy and Marine Corps. My budget baseline for all my classified and unclass systems exceeds 3 billion dollars. I have also been a flight test guy (both operational and developmental), the Chief Pilot for the government at the Sikosky factory in CT., and have managed other large and small scale programs. So, I have a sense of what is good and bad. With that said, every post in this thread is right. For manned air vehicles the specifications are amazing and very difficult to meet, hence the $400 dollar toilet seat. Every piece of equipment in a navy aircraft has to be qualed to 20/20/10...meaning 20g loads in two axis, 10g in the lateral axis before a flight clearance will be granted. Believe it or not, for transport aircraft the entire toilet assembly must be rated to those specs. I don't agree with it, but there it is. Billing. Shaun is right on the money (pun intended). I am dealing with a case against one of my civilian companies because their fanance guy embezzeled over $1M on an old contract. I order yearly audits by government accountants every year and also requested baseline audits when I took command of my program office 3 1/2 years ago. Government acquisition regs are horrendous, especially in the contracting realm. Lastly, outside of the national lab structure, gone are the days when the government paced technology innovation...and the large defense contractors don't either. The hardesst part of my job is maintaining software engineers writing code on my major programs: federal law only allows me to pay a certain wage for certain work...software engineers are so in demand that the gaming industry swoops up all my talent just when they get really good! I am trying to fix that, we'll see. I could go on and on. ![]()
__________________
1996 FJ80. |
||
![]() |
|
Registered
Join Date: Mar 2004
Location: Higgs Field
Posts: 22,585
|
Hey, I'm the guy that actually designs those expensive tools used on aircraft. You might be surprised at just how complex I can make a "hammer". The nomenclature we use to describe our tools does anything but; it just fills a spot on the title block. What really describes the tool (and how to use it) is its part number and associated documentation. This may be anything from a single sheet cartoon ("insert tab "A" in slot "B"...) to a several hundred page technical document.
This "tool" may be a simple task-specific wrench to do something like remove an axle nut. Even that will cost you somewhat more than a Snap-On. This "tool" may also be a jig used to support and align the entire front of a 767 as we skillsaw the top off from the leading edge to the cockpit bulkhead when we are converting a passenger aircraft to a freighter. What do you think one of those "tools" might set you back?
__________________
Jeff '72 911T 3.0 MFI '93 Ducati 900 Super Sport "God invented whiskey so the Irish wouldn't rule the world" |
||
![]() |
|
Registered
|
Ten min. ago I got off the phone with someone who makes sure the gov't. gets less for the taxpayers' dollar. A major gov't. agency we've all heard of is a big client of mine. BUT they don't ever pay their own bills directly to us. Instead, they have a "contractor" get our bills, submit them to the gov't. agency for payment, they pay the contractor and the contractor pays us. As far as I can tell, this contractor does nothing except pass bills and checks between us and this gov't. agency. From what I can tell, this contractor is one-man shop and most likely some kind of minority set-aside or affirmative action thing. He takes our bills, marks them up by XX% and keeps the difference. A lot of PR firms do this too, but they usually offer some kind of service for the money, like writing the press releases for the client or fielding media calls. This contractor does none of that. Sound scandalous? I bet it'd be a lot more scandalous if this gov't. agency tried to cut out the middleman.
__________________
2022 BMW 530i 2021 MB GLA250 2020 BMW R1250GS |
||
![]() |
|
Targa, Panamera Turbo
Join Date: Aug 2004
Location: Houston TX
Posts: 22,366
|
I think one thing is the level of people involved. When you take a look at all the various types of costs that contibute to the price of something it is really amazing how little stuff really does cost the average consumer. Of course there is the scale of economy to consider.
Those special wrenches and so forth that the gov and Mil buy are limited quantity. Many folks do not relize that things like bolts, screws, glue, paint and tools and even toilet seats have to meet certain specifications. You just can't (or shouldn't) use an Allen bolt from Home Depot on an F-18. The metallergy, tolerences and so forth are not tight enough. Granted, there may be things that could work in many applications, but tall the hands involved have to be accounted for. In industry, much of the indirect costs are unknown or hidden.
__________________
Michael D. Holloway https://simple.m.wikipedia.org/wiki/Michael_D._Holloway https://5thorderindustry.com/ https://www.amazon.com/s?k=michael+d+holloway&crid=3AWD8RUVY3E2F&sprefix= michael+d+holloway%2Caps%2C136&ref=nb_sb_noss_1 |
||
![]() |
|
Unregistered
Join Date: Aug 2000
Location: a wretched hive of scum and villainy
Posts: 55,652
|
BTDT, here's one possible scenario rthat may shed some light on how it works:
You will be playing the part of the government, I'll be the contractor. Suppose you are working on a large project and need a toilet seat. Not just any toilet seat, a special one that has to be a custom size and has to meet hundreds of different specifications with stacks of forms and documentation. You go to my company and ask us to supply that special toilet seat for you. my company assigns an engineer to design it and he determines it can be purchaed at the local home depot. he tells you this but you don't want to hear it, you want my company to supply it as you don't have an account at home depot and don't feel like sending the next 6 hours filing out the documentation and forms yourself. So, the engineer contacts the manufacturer and requests the specifications, weight, exact size, weight capacity, etc. All the information he will need to submit to you for your forms. It all meets the specifications you laid out. He then fills out a requitition form and gives it to purchasing. They contact home depot and get a formal quotation, the issue a PO, and the toilet seat is delivered. the bill is paid, end of story, right? No. The engineer has spent at least 6 hours of billable time on your duma$$ request. The purchasing agent has spent at least a half hour processing getting the qoute and the PO and processing the shipping costs. The warehouse guy spends 15 minutes recieving the seat, putting it on the recieving station, and calling the engineer to ask what he's suppose to do with it. Then he spends 20 minutes packaging it up (in the special packaging you require) and ships it to you. The accounts payable clerk has another hour of billable time processing the check, entering the expenses in the log, and then billing YOU for all the costs incurred. In the end, that toilet seat has actually cost my company about $800 in billable time, but I pencil whip it down to $600 and end up eating ther extra cost, because I don't want to upset you or lose you as a customer. Then the press gets ahold of it and incites an entire nation of uininformed, knee-jerkers to call for my head on a platter for supplying something to you at a loss. If you had just went down to the home depot yourself, and if you had gotten rid of most of your ridiculous red-tape and paperwork, this whole mess could have been avoided. |
||
![]() |
|
Unregistered
Join Date: Aug 2000
Location: a wretched hive of scum and villainy
Posts: 55,652
|
My father spend the early part of his career designing new types of explosives for the government, and was a pioneer in the science of shape charges.
He changed direction later and focused on rocket propellants, because it was safer (yea right). Eventually he started designing rocket motors and specialized in rocket nozzles. Almost every single rocket nozzle in use today by our military (and most others as well) incorporates at least one of his patents, in some cases many patents. He tells me stories you wouldn't believe. he has bid on projects before and the government came back and said "your bid is too low, you must increase it by 250% before we can award you the contract". After the challenger shuttle disaster he submitted a white paper (an unsolicited engineering study intended to create potential future business) to NASA, the US military, and morton thyocol detailing a proposed fix, a specially woven and impregnated graphite composite clamp. The government contacted him and rejected his white paper. They then put out a formal bid request for the engineering study. My fathers' company bid very low because they had already done the work. the government said they can't bid that low, they would have to increase the bid before it would be acceptable. The doubled it and re-submitted it, again it was too low. they increased it again, they won the contract, and gave them the same white paper they already had. That was exactly what they wanted. Then they put the actual clamp out for bid. My father's company did not win that bid, one of their competitors did. Then the government contracted my father's company to oversee the design and manufacturing of the clamp, at their competitor's company. So basically my father went to work for the competition and his company leased him out for 4 months. So, they ended up paying hundreds of thousands to get an engineering paper they already had for free, then they paid twice as much for the clamp as they would have if they just let my father's company build it. Note that this was one of about 4 or 5 different "fixes" NASA was pursuing. Last edited by sammyg2; 11-19-2007 at 10:46 AM.. |
||
![]() |
|
Cars & Coffee Killer
Join Date: Sep 2004
Location: State of Failure
Posts: 32,246
|
And we (well--some of us) expect the government to manage healthcare? People will die before they fill out all the forms.
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." |
||
![]() |
|
![]() |
Targa, Panamera Turbo
Join Date: Aug 2004
Location: Houston TX
Posts: 22,366
|
Quote:
Where did you find this quote?
__________________
Michael D. Holloway https://simple.m.wikipedia.org/wiki/Michael_D._Holloway https://5thorderindustry.com/ https://www.amazon.com/s?k=michael+d+holloway&crid=3AWD8RUVY3E2F&sprefix= michael+d+holloway%2Caps%2C136&ref=nb_sb_noss_1 |
||
![]() |
|
AutoBahned
|
Mike - one thing that I didn't see mentioned above is the way profit is added. Sometimes, instead of adding a % profit to cost, a govt. contractor will just take every item in an assembly and add a fixed amount of the profit to it. e.g instead of adding 22% profit to a 20 cent washer, they will add $500 to each item, generating a $500.20 washer (on paper).
|
||
![]() |
|