|
Senior Member
Join Date: Jun 2000
Location: N. Phoenix AZ USA
Posts: 28,977
|
Have done several and with the trencher its not that bad. Course I used to do roofing as a kid so hard work is the norm.
Do several circuits. One high flow for the sprinkler heads, and one or two for the drips.
Make sure you make a map of where the tubing runs and give it to the new owner when you sell the house.
__________________
2021 Subaru Legacy, 2002 Dodge Ram 2500 Cummins (the workhorse), 1992 Jaguar XJ S-3 V-12 VDP (one of only 100 examples made), 1969 Jaguar XJ (been in the family since new), 1985 911 Targa backdated to 1973 RS specs with a 3.6 shoehorned in the back, 1959 Austin Healey Sprite (former SCCA H-Prod), 1995 BMW R1100RSL, 1971 & '72 BMW R75/5 "Toaster," Ural Tourist w/sidecar, 1949 Aeronca Sedan / QB
|