A word of advice from my Eagle project decades ago...
Set it VERY well in the ground!
I built a map board for a trail head that showed the locations of several resting points, and numberd locations for an entire "tree trail" for local children to collect and document leaf collections.
At each of the rest points we built benches that were set fairly well in the ground (4x4 construction, with lower "T" supports buried 3 feet under surface of ground) Each with a small shelter over them. It wasn't 3 months before the board, and half of the benches were ripped out and thrown to the bottom of the ledge that the trail follows! Gotta love vandals!
Hopefully you wont have that problem at a church, but anymore I don't put it past people!
Hope it helps!
-Nick
__________________
Owner: Bennington Motorsports www.benms.com
Sponsor for Midwest Region 944-SPEC racing series
-When was your timing belt changed or tensioned??
-Yes, I'm the crazy man that will loan out my 9201. Just PM me, I will add you to the list and get it out ASAP.
|