|
You should have 2 live legs and a ground wire coming into your service, if it's Single Phase. From either one of the legs to ground is 110V. Between the 2 legs is 220V
Check that with a Electrical Tester to verify.
__________________
72 914 2056: 74 9146 2.2: 76 914 2.0
|