Quote:
Originally Posted by speedracing944
Let me know when it is completed. I would love to rent it for a week and spend the time fishing with the kids.
Speedy 
|
Probably a 6 -8 months out. waiting on money for the well (5-10K

) everything else should be done this fall though.
Some of the details
2x6 construction
smart siding or hardy plank for the siding
wanted to use metal roof but too expensive so back to shingles for now.
screened in porch overlooking the lake.
Forced air heat(no wood burner)