Quote:
Originally Posted by PRE-H20
10 months ????
I envy you brother !!!
I got hit with a complete remodel ALL at the same time.
Remodel kitchen
Remodel Master bath
Remodel hall bath
Recessed lighting entire house
Remove popcorn entire house
Remove a wall in kitchen
New carpet entire house
New hardwood floors
Crown molding entire house
New base boards entire house
Reface and paint exterior of house
New freaking driveway
New interior doors
New AC unit
All new fixtures.
Feel my pain ????
10 months??? Man I envy you. This ALL went down in 1.5 months...... sigh!
|
You did all that yourself in 1.5 months!?
I've been slaving away around work hours, outside chasing an 18 month old, dealing with prego wife and everything else life has to offer.
The only things on your list that we didn't do were:
-Driveway: but can be replaced with Patio and R/R of overgrown beds surrounding house, replant about 30% of lawn
-Crown around house
-Popcorn Ceilings: But can be replaced with 400+hrs we (usually a team of 4) had in wallpaper removal
Last couple pending items:
-New Hall Bath Vanity delivered today
-Must order French Door for new Patio access
-Touch up some trim throughout
The Saucy Wish-List:
-Bro-Space (I refuse to say "man cave") needs a redeux
-Garage...needs 100% makeover as the sheetrock is falling off the ceiling, there is 1 light bulb lighting the entire garage and 1 outlet, could also use another bay
All in all. It's been an amazing experience.
Thread to follow post hall bath redeux