Quote:
	
	
		| 
					Originally Posted by Tidybuoy  I'm not opposed to the wallpaper idea but if I had planned on that, I wouldn't have textured the walls.  To wallpaper, I would need to float the wall first.  I'm hoping to get this job done in the next couple of days so I can start preping the floors for epoxy (for that, I need a couple of weeks). | 
	
 
I missed the part in your OP about textured. Not sure how but I did. Yeah that will add a degree of difficulty. The chair rail molding would be an easy addition. 
Look into a husqvarna floor grinder to rent for the epoxy. It only has a 10" head but those diamond inserts make quick work of prepping the floor.