Question about septic system for the brain trust
![]() I don't understand some of the terms on this sketch of the septic system. 1. "Well isolation line" 2. "B.M. Nail in tree" (WTF??) 3. "Earth dam" (nothing on the surface indicates anything different below ground)
__________________
. |
||
![]() |
|
Registered
Join Date: May 2005
Location: Houston
Posts: 5,469
|
B.M. Nail in tree is NOT a "Bowel Movement" in the tree...haha!
It is a survey term short for "Bench Mark", which is a reference when setting up survey equipment to a fixed object to get all survey shots consistent and properly geo-referenced. Is the Well isolation line for a water well versus the septic?
__________________
Ole Skool - wouldn't have it any other way |
||
![]() |
|
Registered
|
Quote:
__________________
. |
||
![]() |
|
Registered
Join Date: Mar 2003
Location: Charlottesville Va
Posts: 5,758
|
Quote:
Earth dam is likely compacted soil at either end of the leach field to prevent leachate runoff.
__________________
Greg Lepore 85 Targa 05 Ducati 749s (wrecked, stupidly) 2000 K1200rs (gone, due to above) 05 ST3s (unfinished business) |
||
![]() |
|
undervalued member
|
I would guess the earth dams are compacted native material that "cap" the end of the line to act as an impervious dam where the rock & the leach lines end. Confines the wastewater to the leach lines promoting it to only drain into the soil below the system.
Agree that the isolation line is the minimum distance between the two facilities.
__________________
78SC PRC Spec911 (sold 12/15) https://www.youtube.com/watch?v=f7I6HCCKrVQ Now gone: 03 996TT/75 slicklid 3.oL carb'd hotrod 15 Rubicon JK/07.5 LMM Duramax 4x/86 Ski Nautique Correct Craft |
||
![]() |
|
Platinum Member
Join Date: Jul 2001
Location: Leave the gun. Take the cannoli.
Posts: 20,944
|
IDK about your area, but here it is 50' from well to septic tank(s) and 100' from well to septic.
BenchMark & 'dams' as above. I haven't seen a system like that in years, on a slope engineers used to call for use clay dams(barriers) on the low side, as of mid-90's there is a band of select fill around the septic beds instead. I suspect that system is 40+ years old?
__________________
The truth is that while those on the left - particularly the far left - claim to be tolerant and welcoming of diversity, in reality many are quite intolerant of anyone not embracing their radical views. - Charlie Kirk |
||
![]() |
|