Pelican Parts
Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   Pelican Parts Forums > Miscellaneous and Off Topic Forums > Off Topic Discussions


Reply
 
LinkBack Thread Tools Rate Thread
Author
Thread Post New Thread    Reply
Registered
 
LakeCleElum's Avatar
 
Join Date: May 2004
Location: Lake Cle Elum - Eastern WA.
Posts: 8,417
I did this not long ago. My Panel (200 amp) had space for more breakers. I put a breaker on each side. A red wire to one side, black to the other, white to neutral and ground to ground. I ran 130 ft. of under ground wire to the detached garage I built and wired this in to a panel there.

Just make sure the "Main" is off when doing your connections and no danger. Works well.

__________________
Bob S.
73.5 911T
1969 911T Coo' pay (one owner)
1960 Mercedes 190SL
1962 XKE Roadster (sold) - 13 motorcycles
Old 09-29-2008, 07:24 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #21 (permalink)
Registered
 
Shaun @ Tru6's Avatar
 
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,373
Thanks Bob. the main is out front, again, easy access.
__________________
Tru6 Restoration & Design
Old 09-29-2008, 07:26 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #22 (permalink)
Used Up User
 
imcarthur's Avatar
 
Join Date: Jun 2003
Location: Toronto
Posts: 8,311
Garage
Shaun

The triple gang breaker tells you it is 3 phase. Probably 120/208V. There is no room for more breakers which means a sub panel will be required. Get an electrician because this involves conduit etc.

Also, what voltage is the equipment you wish to connect? There should be specs with a voltage range. Does it say 208V - 250V or similar?

Ian
__________________
'87 Carrera Cab

----- “Only two things are infinite, the universe and human stupidity, and I'm not sure about the former.” A. Einstein -----
Old 09-29-2008, 07:30 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #23 (permalink)
Registered
 
Join Date: May 2002
Location: St Louis
Posts: 4,211
Is that three phase?

Buy a lathe and milling machine.
__________________
Rick
88 Cab
Old 09-29-2008, 07:31 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #24 (permalink)
Registered
 
Join Date: Nov 1999
Location: Las Vegas, Nevada, USA
Posts: 646
Hi Shaun,

But I also have a 1983 911SC, and am an architect!!!!

Though I've built plenty of houses for myself, including a 7,000 SF for my family, when it came to the 220 V for the garage and laundery and kitchen, I hired an electrician. Everyone is really correct - 220 volts is a nasty amount of voltage to be "playig" with unless you are super careful and read up on how to do it. You don't have to hire them for the whole job, but I do understand about finding one to do such a "small" job.

But let's not forget that there is a huge slow-down in the construction industry (and architecture industry), so you should be able to find a licensed electrician willing to make some money to buy his groceries.
__________________
Andras
1983 911SC The Chocolate Kiss
1998 Audi A6 Quattro (Family Car)
2002 Audi TT Roadster (Wifey's Car)
1992 Mazda Miata (Daughter's Car)
1991 Honda VFR750F Interceptor
1982 Honda VF750S Sabre
Old 09-29-2008, 07:34 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #25 (permalink)
Registered
 
Shaun @ Tru6's Avatar
 
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,373
Thanks Guys. Silkscreen Conveyor Dryers are typically 220V 1 Phase, putting out 5000 Watts or so. Same with a big air compressor, and then an industrial size clothes dryer, which are 200+.

Will also be running flash dryers, but those 110V.

It does sound more like I will need a qualified electrician. Running cable is pretty easy in the building, I've been up in the roof superstructure, doesn't seem that it would be that difficult.
__________________
Tru6 Restoration & Design
Old 09-29-2008, 07:48 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #26 (permalink)
 
Unregistered
 
sammyg2's Avatar
 
Join Date: Aug 2000
Location: a wretched hive of scum and villainy
Posts: 55,652
Ron Richardson: Yeah? Are you gonna make it all 220?
Jack Butler: Yeah. 220... 221, whatever it takes.

Old 09-29-2008, 08:18 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #27 (permalink)
Feelin' Solexy
 
Tishabet's Avatar
 
Join Date: Oct 2003
Location: WA
Posts: 3,790
Shaun,
I had a guy run a 220v plug in my home about 3 years ago, all of the work came to about $250. I'll PM you his contact info in case you want to get a quote from him.
__________________
Grant
In the stable: 1938 Buick Special model 41, 1963 Solex 2200, 1973 Vespa Primavera 125, 1974 Vespa Rally 200, 1986 VW Vanagon Syncro Westfalia, 1989 VW Doka Tristar, 2011 Pursuit 315 OS, 2022 Tesla Y
Gone but not forgotten: 1973 VW Beetle, 1989 Porsche 944, 2008 R56 Mini Cooper S
Old 09-29-2008, 08:19 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #28 (permalink)
Registered
 
Shaun @ Tru6's Avatar
 
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,373
Thanks for the PM Grant, I'll give him a call later today. Much appreciated!
__________________
Tru6 Restoration & Design
Old 09-29-2008, 08:27 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #29 (permalink)
Registered
 
Join Date: Mar 2004
Location: Los Angeles
Posts: 17,407
Quote:
Originally Posted by Porsche-O-Phile View Post
Exactly - do the rough in and have a licensed electrician make the final connections & call for inspection. Shouldn't be too expensive.
What??? You mean have someone just come out and connect the wires. How much will you pay for that? One, its not worth his time and people will never pay someone for 15 min. of work. Second, now he's responsible for all of the electrical work because the permit is under his / co's name. I am shock to hear that from you. I know you would not sign off or put your name on any drawings drawn by some non lic. architect or business owner for that matter. I was trying to be a nice guy once while working in some West Hollyweird condo (these were $700,000+ condos, not for the poor) The condo owner down below begged me to help him adj all of his out of wack kitchen cabinet doors. No one was dumb enough to come out to do it. Since we were there, I was thinking, what the heck. I charged him $100 and spend an hour or 2 doing it. When I got done in an hour, he refuse to pay and said it only took a little bit of my time, and that not even he made $100 an hour. So, he took $30 bucks out of his wallet and gave it to me. and Said,"I think this should be more then enough for what you have done." I return his money and wish him a nice weekend. I hate ******* cheap people. I had my men run the chipping hammer on some useless 2X4 on the floor extra early on that saturday morning and as late as possible during the rest of the week just for fun.

Last edited by look 171; 09-29-2008 at 08:50 AM..
Old 09-29-2008, 08:45 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #30 (permalink)
Serial Lurker
 
ledhedsymbols's Avatar
 
Join Date: Oct 2005
Location: Mount Vernon WA
Posts: 1,252
Send a message via AIM to ledhedsymbols
The building is likely to have a 480/277 3 phase system. It is easily done w/ a transformer to get the 120/208 for wall outlets etc.

If you want it done correctly, safely, and up to code, hire a professional. It takes 8000 hours and usually a state licensing exam to be a commercial electrician. It not just a union racket. The National Electric Code for 2008 is over 650 pages long.

This is not just installing a new outlet in your house. Depending on your building you could have a 480 3-phase system with 400 Amps at the service. The branch circuits alone for your wall outlets are 120V at 15-20 Amps. As was previously pointed out is only takes 20 Milliamps across your heart to kill you, nevermind the fire danger.

Breakers and fuses have to be sized, wire needs to be sized, equipment has to be correct and listed for the application to prevent fires and personnel hazards.

In short, hire a pro, prevent the possiblity of damage and injury.

Micah
__________________
Does anyone know where the love of god goes when the waves turn the minutes to hours?
Old 09-29-2008, 03:34 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #31 (permalink)
Registered
 
elwood-914's Avatar
 
Join Date: Sep 2001
Location: Foothills, Ca
Posts: 699
Get an electrical contractor. Done. Some of the advice is bad. Installation will be better and you will not be libel for doing your own work. Everyone thinks they can do electrical, but do they do it up to code, usually not.
Your not going to get a 'union electrician' come out. Get an estimate from a contractor
__________________
1973 green 1.7
1973 Orange 2.0
1989 Ford F-150
Old 09-29-2008, 07:11 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #32 (permalink)
 
UnRegistered User
 
billybek's Avatar
 
Join Date: Dec 2007
Location: Calgary
Posts: 8,023
Garage
Breaker box is full although both those big three phase breakers are off. If what they once supplied is no longer in service or in the building you (your electrician) could re size the breaker to the appropriate size and run new wire/ conduit.
If you are running conduit, it won't be cheap and you won't believe the price for copper these days.
600/575 is kind of a Canadian thing in North America. It is amazing how much difference you see in wire size (decrease) going from 208 to 460 and 460 to 575 VAC.
Hope it works out!
__________________
Bill K.
"I started out with nothin and I still got most of it left...."
83 911 SC Guards Red (now gone)
And I sold a bunch of parts I hadn't installed yet.

Last edited by billybek; 09-29-2008 at 07:42 PM..
Old 09-29-2008, 07:38 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #33 (permalink)
Registered
 
Join Date: Nov 1999
Location: Las Vegas, Nevada, USA
Posts: 646
And if things don't work out, please ask your widow to inform us of your demise, so that we can use you as another recipient of the Darwin Award!

Electricity can kill. It sounds like there are enough issues with your attempte4d "project" to raise red flags. This does not sound like a simple connect wire A to panel board B.

As an architect, I'd advise you to find a friendly Porsche Club memeber who is an electrical engineer or an electrical contractor and ask their advice first. And then try to find a licensed electrician who is willing to moonlight on this.

The Economy is bad enough that they are out there, needing work, and/or needing the extra money.
__________________
Andras
1983 911SC The Chocolate Kiss
1998 Audi A6 Quattro (Family Car)
2002 Audi TT Roadster (Wifey's Car)
1992 Mazda Miata (Daughter's Car)
1991 Honda VFR750F Interceptor
1982 Honda VF750S Sabre
Old 09-30-2008, 07:54 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #34 (permalink)
Registered
 
Shaun @ Tru6's Avatar
 
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,373
Grant's recommendation Rob is coming out next Thursday to take a look.

thanks again!
__________________
Tru6 Restoration & Design
Old 09-30-2008, 10:50 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #35 (permalink)
Registered
 
Zeke's Avatar
 
Join Date: Jan 2002
Location: Long Beach CA, the sewer by the sea.
Posts: 37,772
Not all electricians are up to speed. I've seen my share of real bad ones. The one thing that really surprised me years ago involved a 3-phase system. The electrician wired a 220 circuit to 2 of them as that's usually how it works. Turned out that the power company in this particular state (MS) used the middle circuit for what they called a "stinger" circuit. More voltage. Yep, they fried several single phase motors until someone figured out to move the one leg over.

I've got a few more Darwin electrician stories.
Old 09-30-2008, 03:40 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #36 (permalink)
Detached Member
 
Hugh R's Avatar
 
Join Date: May 2003
Location: southern California
Posts: 26,964
Shaun, you rent? You get electrical fire, no electrical permit, no insurance coverage for the building or your stuff.
__________________
Hugh
Old 09-30-2008, 03:58 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #37 (permalink)
Registered
 
Shaun @ Tru6's Avatar
 
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,373
one of the main factors why I'm going with a pro. also going to look at some projects, like more light switches for the overheads...currently have 8 lights on when I only need to the vast majority of the time.
__________________
Tru6 Restoration & Design
Old 09-30-2008, 05:21 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #38 (permalink)
Registered
 
Shaun @ Tru6's Avatar
 
Join Date: Dec 2001
Location: Cambridge, MA
Posts: 44,373
Here's the quote for the work to be done.

Total is $1225 (scope creep)

thoughts? seems pretty reasonable.

__________________
Tru6 Restoration & Design
Old 10-14-2008, 05:30 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #39 (permalink)
Soldier of Fortune
 
DasBoot's Avatar
 
Join Date: Aug 2008
Posts: 987
Quote:
Originally Posted by Shaun 84 Targa View Post
Total is $1225 (scope creep)

thoughts? seems pretty reasonable.
Very reasonable. What's his hourly rate?

Old 10-14-2008, 06:07 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #40 (permalink)
Reply


 


All times are GMT -8. The time now is 05:39 AM.


 
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website -    DMCA Registered Agent Contact Page
 

DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.