Boeing Dreamliner (nightmare liner)
Boeing 787 may not fly this year
The structural flaw that delayed the first flight of the 787 Dreamliner is more complex than originally described by the company, and the plane's inaugural takeoff is likely at least four to six months away, say two engineers with knowledge of Boeing's problem. By Dominic Gates Seattle Times aerospace reporter GREG GILBERT / THE SEATTLE TIMES Boeing's Dreamliner No. 1 performs taxi tests earlier this month at Paine Field in Everett. The company hasn't set a new date for the first flight as its engineers work to solve a structural flaw affecting the wing-to-body join. GREG GILBERT / THE SEATTLE TIMES Heading into today's quarterly earnings report, Boeing has neither set a new schedule nor outlined its plan to fix the structural flaw discovered in May. The structural flaw that delayed the first flight of the 787 Dreamliner is more complex than originally described by the company, and the plane's inaugural takeoff is likely at least four to six months away, say two engineers with knowledge of Boeing's problem. "It's got to take at least three to four months just to get something installed on an airplane," said a structures engineer who has been briefed on the issue. "It's definitely a costly fix to go and do this work." A second engineer, who is familiar with the details of Boeing's construction method, said the fix must first be made on the nonflying test airplane in the Everett factory. Assuming that's successful, it will take another month or two to install the fix on the first airplane to fly. Both engineers said the issue requires a thorough redesign of the plane's wing-to-body join, and the necessary parts will be very difficult to install on the test airplanes that have already been built. The engineers' accounts differ from Boeing's description June 23 when it acknowledged a problem and again postponed the first flight of the much-delayed plane. Dreamliner program chief Scott Fancher said then that the fix would be "a simple modification" requiring only "a handful of parts." But almost a month later, heading into today's quarterly earnings report, Boeing has neither set a new schedule nor outlined its planned fix of the problem. The second engineer said the problem is caused by high loads at the ends of the stringers on the upper wing skins. Stringers are the long composite rods, shaped like I-beams, that stiffen the inside of the wing skin. There are 17 stringers on each upper wing, all of them subject to compression forces when the wings flex upward in flight. At the point where each stringer ends, close to where the wing and body of the plane are joined, those forces pull the stringer away from the skin. During a wing-bending test in May on the ground-test airplane inside the Everett factory, the fibrous layers of the composite plastic material delaminated at these stress points. Such a separation of the material isn't likely to lead to catastrophic failure of the airplane, but it would require constant monitoring and potentially costly repairs by the airlines. Any tear in the material would have to be promptly fixed to avoid spreading of the delamination. If Boeing's initial fix fails to divert enough of the load away from the stress points, the delay in first flight could extend beyond six months, pushing the date out into 2010. "There's no guarantee that what (Boeing) is doing will work," the second engineer said. "If the testing or analysis shows it doesn't get rid of the load, then the engineers are back to square one." Further delays Beyond first flight, solving the structural flaw could also further slow the plan for ramping up production. Boeing's current focus is on an interim solution to the stringer problem for the test planes that it has already built. The first engineer said Boeing hasn't had time yet to figure out at what point in production to introduce a permanent redesign on all subsequent jets. "None of that is nailed down yet," he said. "There's no schedule." Boeing has a large team of engineers working on the analysis, the redesign and how the fix could be implemented. Those engineers are focusing on a solution that will send mechanics inside the wings of the assembled planes to trim the ends of each upper wing-skin stringer. They will create a U-shaped cutout in the end of the stringer, leaving the flanges at top and bottom untouched. The U-shaped cut in the stringer ensures that the load on the flange away from the skin, the inner flange, will transfer entirely into the strong titanium fitting at the wing-body join and not into the wing skin, the engineers said. The hope is that will reduce the stress point load enough to prevent future delamination. The reshaped stringer ends must be refastened with newly designed parts to the titanium fitting, which connects the wing stringers to similar stringers on the fuselage side of the join. And the design must accomplish this without creating another stress point somewhere else. To reinforce the stringer ends, mechanics will also add some fasteners that go through stringer and skin. The 17 stringers on each side don't all require the same reinforcement, but Boeing wants one design fix for all, so whatever is the beefiest reinforcement needed will likely be done for all the stringers, said the first engineer. This retrofit will be tremendously difficult to implement on the airplanes already built because the mechanics will have to do the tedious and meticulous work inside the confined space of the wing. "Drilling holes in titanium is difficult. Drilling holes in composite is difficult. And the access will be very difficult," said the second engineer. And when Boeing finally comes to do the job on Dreamliner No. 1, it will first have to empty the fuel from the wing tanks so that repair crews can work inside. Previous problems Excessive loads at stringer ends (known to engineers as "runouts") is not something that should have struck Boeing out of the blue. "The problem with stringer runouts has been identified in the past and recognized as a problem," the second engineer said. He said the issue has arisen on other composite airplanes. Indeed, the first engineer said the stress point at the end of the 787 stringers showed up as a "hot spot" in Boeing's computer models before the delamination in the wing bend test — but for some reason it was never addressed. The delamination happened after the wing bend test reached ultimate load, which is 50 percent higher than the maximum load expected in service. The second engineer said reaching that load proves that Boeing's heavy titanium structure is as strong as it needs to be. However, the delamination of the wing skin could have begun well before that load was reached, he said. In the tests of the proposed fix that lie ahead, he said, engineers will have to inspect the stress points for delamination closely at every increment up to the highest loads. Boeing spokeswoman Yvonne Leach said the company "will provide details on the technical solution in due course as we finalize our plans for implementation." The company reports its quarterly earnings before the stock market opens today. In an early-morning teleconference after the earnings news is released, Boeing management will be quizzed closely by Wall Street analysts for more detail on the expected program delay. It's likely the executives won't yet have precise answers.
__________________
1984 911 CARRERA RUBY RED TARGA SW CHIPPED-BURSCH CATBYPASS MONTY FREE FLOW EXHAUST <IN GAS WE TRUST> |
||
![]() |
|
Registered
|
When I was still at Boeing, alot of people laughed and pointed at Airbus when the A380 wiring problem came up. At the same time, we (Boeing) were claiming that the 787 was ahead of schedule and everything was great. I knew better.
Having said that, Boeing will solve this problem. These kinds of things happen every day and the general public just doesn't have any visibility, typically. Back when I was still McDonnell Douglas, the C-17 ran into a serious wing/fuselage joint issue and everyone (outside of McDonnell Douglas) was wringing their hands and worrying of impending doom and we all know how the C-17 turned out...great airplane.
__________________
Mike 1976 Euro 911 3.2 w/10.3 compression & SSIs 22/29 torsions, 22/22 adjustable sways, Carrera brakes |
||
![]() |
|
Cars & Coffee Killer
Join Date: Sep 2004
Location: State of Failure
Posts: 32,246
|
Is the A380 flying yet in the hands of customers?
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." |
||
![]() |
|
Model Citizen
Join Date: May 2007
Location: The Voodoo Lounge
Posts: 18,836
|
Boy, I hope not. I want it flying in the hands of experienced pilots.
__________________
"I would be a tone-deaf heathen if I didn't call the engine astounding. If it had been invented solely to make noise, there would be shrines to it in Rome" |
||
![]() |
|
Banned
Join Date: Jan 2007
Posts: 8,509
|
Yes the A380 has been in the hands of Emirates, Singapore and Qantas for some time (and a few others besides).
I think the 787 will be a huge success for Boeing once they are flying. The machinists strike set it back a number of months- maybe six- all that delay isn't design and engineering. Note the engineers quoted aren't named- and appear to be a bunch of whining fatalists. The writer isn't doing the biggest employer in his city any favors with that article either. Now the unions are *****ing because Boeing is setting up shop in a right to work state (South Carolina, outside Charleston) and is going to be transferring major portions of work there. Good for SC (and Boeing) I say. Bad for unions and Seattle papers. Last edited by cairns; 08-18-2009 at 07:23 AM.. |
||
![]() |
|
Registered
Join Date: Jul 2005
Location: France
Posts: 4,596
|
__________________
Who Dares, Wins! |
||
![]() |
|
![]() |
Cars & Coffee Killer
Join Date: Sep 2004
Location: State of Failure
Posts: 32,246
|
Isn't that a moot point? I mean, isn't the A380 programmed to override the pilot's instructions in certain situations?
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." |
||
![]() |
|
THE IRONMAN
|
Quote:
__________________
1984 911 CARRERA RUBY RED TARGA SW CHIPPED-BURSCH CATBYPASS MONTY FREE FLOW EXHAUST <IN GAS WE TRUST> |
||
![]() |
|
THE IRONMAN
|
News that Boeing is postponing the first flight of the 787, the Dreamliner, has badly damaged Boeing's already-dented credibility. It raises questions about its reliability compared with Airbus. And it sets the company up for a much tougher financial climb.
http://seattletimes.nwsource.com/html/jontalton/2009374462_biztaltoncol24.html
__________________
1984 911 CARRERA RUBY RED TARGA SW CHIPPED-BURSCH CATBYPASS MONTY FREE FLOW EXHAUST <IN GAS WE TRUST> |
||
![]() |
|
Cars & Coffee Killer
Join Date: Sep 2004
Location: State of Failure
Posts: 32,246
|
I think you're overestimating the damage.
Do you work for EADS?
__________________
Some Porsches long ago...then a wankle... 5 liters of VVT fury now -Chris "There is freedom in risk, just as there is oppression in security." |
||
![]() |
|
Senior Member
Join Date: Feb 2000
Location: Lacey, WA. USA
Posts: 25,310
|
Yes, it is. The delay is blamed on the strike, but delivery of the subcontracted parts was seeing delay after delay after delay when the strike began. Boeing wouldn't have had the parts to build it anyway, and then the strike opportunity came and it was perfect for Boeing. I won't say that Boeing's problems are not labor-related, but I will say the problem is not the Seattle machinists. The problem is the quality, or lack thereof, of the work done elsewhere. Obviously.
__________________
Man of Carbon Fiber (stronger than steel) Mocha 1978 911SC. "Coco" |
||
![]() |
|
Registered
Join Date: Jul 2004
Location: Maryland
Posts: 31,430
|
I found this quote interesting:
Indeed, the first engineer said the stress point at the end of the 787 stringers showed up as a "hot spot" in Boeing's computer models before the delamination in the wing bend test — but for some reason it was never addressed. The delamination happened after the wing bend test reached ultimate load, which is 50 percent higher than the maximum load expected in service. The second engineer said reaching that load proves that Boeing's heavy titanium structure is as strong as it needs to be. However, the delamination of the wing skin could have begun well before that load was reached, he said. In the tests of the proposed fix that lie ahead, he said, engineers will have to inspect the stress points for delamination closely at every increment up to the highest loads. I'm sure some Boeing folks will weight-in. I spent a good chunk of my life working in aircraft design, flight test and production...there is no such beast as a zero defect design and test regime, thats why you do it, but the bold sentence above concerns me.
__________________
1996 FJ80. |
||
![]() |
|
![]() |
Did you get the memo?
Join Date: Mar 2003
Location: Wichita, KS
Posts: 32,346
|
Slighted engineer = good quotes for newspaper. Much like Zef, they can have ulterior motives.
__________________
‘07 Mazda RX8-8 Past: 911T, 911SC, Carrera, 951s, 955, 996s, 987s, 986s, 997s, BMW 5x, C36, C63, XJR, S8, Maserati Coupe, GT500, etc |
||
![]() |
|
THE IRONMAN
|
Quote:
__________________
1984 911 CARRERA RUBY RED TARGA SW CHIPPED-BURSCH CATBYPASS MONTY FREE FLOW EXHAUST <IN GAS WE TRUST> |
||
![]() |
|