![]() |
I asked for pictures...
Quote:
JR |
Quote:
|
One thing that stands out in my mind is this:
Quote:
More details needed... JR |
Correct. Here's the building. I have the second floor. To the left (dark brick) is a moving company, can go through that building but has a small door in the back to get to the back of my building.
Going through the front would be easy with the loading dock, but I would have to open up a doorway on the inside to get the press in the back production room. http://forums.pelicanparts.com/uploa...1288271259.jpg http://forums.pelicanparts.com/uploa...1288271280.jpg |
Talk to Brookside, they aren't too far away (about 1 hour on Hwy 2) and they have a good selection of lifts. You will need either a telescopic unit or a 3 stage mast. I'm not sure a 3 stage mast will fit through an 8 foot tunnel.
Forklift, Used Forklift, Forklift For Sale At MachineryTrader.com - Page 1 |
Okay, so to get to that parking lot shown in your picture, you have to drive under something with 8'-0" clearance? And, there's no access on the other side of the building that a crane could get right next to?
In that case, your best option is a fork lift. They can be rented farily cheaply and either driven to the site, or delivered to the site on a trailer. I've done both, depending on how close I was to the rental yard and what streets were in between. I'd give up on the making-my-own-crane idea.... You sure the windows shown are large enough to get the press throught them? You going to be the one removing them? JR |
here's the roof. don't think hanging anything from this is a viable option.
http://forums.pelicanparts.com/uploa...1288279027.jpg |
If I can rent a forklift, that would be a good option. busy day today, one sign co. I called needs truck access. considering putting it in through the front and then angling through doors. Would only need to construct a dolly to hold the press in a horizontal position. need to take more measurements to finalize.
Quote:
|
geez..a rubber wheeled forklift would be perfect. like this. i've run one (for fun) it is easy. this one lifts 8 tons which is much more than you need. reach is gonna govern the one that you rent.
http://forums.pelicanparts.com/uploa...1288279316.jpg |
Please forgive the following bluntness. It looks like this is trying to squeeze industrial equipment into office space.
I'm assuming: 1. There is a long-term lease signed that will make all these relocating costs/efforts cost-efficient over time. 2. The owner has signed off on the equipment in writing, or preferably it is noted in the original lease. Important in case the floor decides it can't handle an extra 1,000lbs+.... Also, if it is not on concrete or a solid base, movement may waste a lot of raw material. Does your business insurance cover this potential loss? 3. The costs of moving the press out later on are noted. Redoing an interior 2x4/sheetrock wall seems like the easiest solution. Those windows may not be available anymore in case of breakage, and look like a tight squeeze. A forklift operator would probably have to pivot at full lift on the narrow dock. |
John you would do that lift from the ground with a shooting boom lift... Not a convetional forklift on the dock...What Vash pictured would be perfect... Provided it can be gotten around to that side of the building....
|
Quote:
|
The second half of the move is when the crane has got the thing inside, 3 feet up in the air.
Use 2-4 engine cranes or what? The carpet's thin and trashed, but it could bunch up at the wrong time. I'd consider putting down 3/4 plywood to distribute the weight over the floor better, don't want a wheel punching through at the wrong time. Who knows what's under it. |
Find a new building?SmileWavy
|
Quote:
This is an industrial building in which the second floor was converted to office. Floor is concrete under the carpet. Don't expect any problems with the press weight. |
Shawn, move to NH,, no taxes and MUCH closer for those "I need help from Chris" runs!!!
|
I wonder what a machinery moving company would charge. Everyone has heard of our local machinery movers, the Dunkel Brothers. Last I read about them (just a few days ago), they were installing a large outdoor sculpture. It required a crane.
I had a lift done of a spa/tub a couple years ago. I paid the guy 400 which included a tip. http://forums.pelicanparts.com/uploa...1288285651.jpg |
how can a building with a loading dock have an 8' height restriction???
|
Quote:
|
different buildings.
my building has no door in the back at all. building next door does. |
All times are GMT -8. The time now is 05:10 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website