Pelican Parts Forums

Pelican Parts Forums (http://forums.pelicanparts.com/)
-   Off Topic Discussions (http://forums.pelicanparts.com/off-topic-discussions/)
-   -   New Question on Floor Prep for Epoxy (http://forums.pelicanparts.com/off-topic-discussions/971176-new-question-floor-prep-epoxy.html)

Tidybuoy 09-22-2017 07:28 AM

New Question on Floor Prep for Epoxy
 
Got a question on Floor Prep - before Epoxy

Painting took longer than expected so I haven't got any of my floor prep started. Now the weekend is here and I was planning on renting a cement resurfacer.

Question: does it matter "when" I surface the cement. I.e., I haven't degreased yet, can I do this after the resurfacing or should I degrease first. I want to take advantage of the weekend to resurface the concrete so I'm hoping I can do this tomorrow and then spend next week degreasing, pressurewashing, etc..

TimT 09-22-2017 01:46 PM

Degrease first, lest you redistribute all the grease while grinding the surface.

After you finish all your prep, take a 1 foot square of poly and tape it down with duct tape... leave overnight.... if the next day there is moisture trapped under the poly, rethink the coating you want to apply... sealer or stain might be better than epoxy, if there is a lot of moisture..

Bob Kontak 09-22-2017 02:30 PM

Quote:

Originally Posted by TimT (Post 9747303)
Degrease first, lest you redistribute all the grease while grinding the surface.

Meh. I say no. Just me. Not arguing.

Beat the shiet out of the floor. Get it down to a nub. Powerwash like a fiend.

bpu699 09-22-2017 03:45 PM

Don't do it...

I did, and 2-3 years started peeling off... Good luck fixing it...

If ANY water gets in behind it, from condensation or rain, etc, it will not stick...

TimT 09-22-2017 03:58 PM

Quote:

Meh. I say no. Just me. Not arguing.

Beat the shiet out of the floor. Get it down to a nub. Powerwash like a fiend.
Sure recommend doing it wrong...thats good advice..

Surface prep is key for the success of any coating system... cleaning and degreasing are first.. often followed by chloride remediation (if on steel surfaces) then surface prep by creating a profile..

Those pesky organizations that set standard for paints and coatings are where the procedures come from.... NACE... SSPC... ASTM...

Oh and wow... here is a guide from the manufacturer of one of the epoxy floor coatings...

Epoxy Coat Installation Instructions


Step 1: Clean and Sweep

Step 2: Degrease...


Or you could just smear that grease and oil around and have the coating come up...

URY914 09-22-2017 04:41 PM

I gotta agree with TimT on this one ;)

cabmandone 09-23-2017 02:17 AM

Clean and degrease first. Then grind the floor.

javadog 09-23-2017 03:30 AM

Clean and degrease it first, then shot blast it.

But, we covered that in your other thread...

Someone also mentioned testing for water migration through the slab. That should've been done long before you decided to put epoxy down on the floor.

MT930 10-01-2017 07:56 PM

Just had one done by the pros they cleaned degreased. Ground -fillled cracks re ground. Epoxyed then put a poly urethane UV coating on top. Lots of grinding.
I would try it but the grinding is the key. This guy used some specialized grinder with a big vac I have no idea where you could rent one.

I have seen a lot of hanger floors done with success and failure.

The grind gives the profile that the epoxy can grip. Any oil or dirt the epoxy will lift.


http://forums.pelicanparts.com/uploa...1506916137.jpg
http://forums.pelicanparts.com/uploa...1506916161.jpg


All times are GMT -8. The time now is 02:58 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website


DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.