View Single Post
tcar tcar is offline
Registered
 
Join Date: Oct 1999
Posts: 8,673
Quote:
Originally Posted by Rtrorkt View Post
2 hour wall requires a "B" Labeled fire door. Typically rated at 90 minutes, though the occupancy designation and construction type for each suite and the building will dictate. It must be the full assembly, door, frame and hardware rated the same
...yes... and hardware includes closer.
Old 06-06-2018, 10:17 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #4 (permalink)