Quote:
Originally Posted by Rtrorkt
2 hour wall requires a "B" Labeled fire door. Typically rated at 90 minutes, though the occupancy designation and construction type for each suite and the building will dictate. It must be the full assembly, door, frame and hardware rated the same
|
...yes... and hardware includes closer.