View Single Post
GWN7 GWN7 is offline
Registered
 
GWN7's Avatar
 
Join Date: Jun 2002
Location: Winnipeg, MB, Canada
Posts: 3,963
Also depending on your soil conditions you may be required to install piles or ground hogs (depending on what the engineer requires) before you can build your footing.

Infill houses next door were required to go down 24' from the 10' deep basement hole they had dug for a total depth of 34" from grade with ground hogs. It would have been the same with belled concrete piles at a higher cost so they went with the ground hogs which were welded directly to the footing steel.
__________________
Bunch of old cars
Old 06-29-2018, 10:58 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #15 (permalink)