|
Registered
Join Date: Apr 2007
Location: I live on the road, I just stay here sometimes...
Posts: 7,104
|
When I did mine I cribbed from inside and used hrydolic jacks on those cribs to lift and then block it so that I could work on sections using a small backhoe from the outside.
I built a 8 foot tall, 6" thick wooden foundation (following code using preserved plywood and for extra peace of mind, a barrier layer before backfilling with sand and drainage pipe).
At the base I poured footings to build the wall on. I also insulated the cavity of the 6" thick wall using blue styrofoam.
If your digging a trench, be careful about working in it.
__________________
73 RSR replica (soon for sale)
SOLD - 928 5 speed with phone dials and Pasha seats
SOLD - 914 wide body hot rod
My 73RSR build http://forums.pelicanparts.com/porsche-911-technical-forum/893954-saving-73-crusher-again.html
|