Quote:
Originally Posted by jyl
Thanks, everyone!
The 10/4 MC cable sure would be easier than conduit. The 50' run from subpanel to location has to snake around HVAC ducting in one spot. Looks like it will cost 2X as much as 4 x 10 ga THHN in sched 80 PVC conduit, though :-(
|
Make sure you use the special M.C. connectors to connect the cable to the boxes. It looks very similar to a Romex connector except it has a smooth round hole for the conductors to pass through and you use a small red plastic bushing (a “redheadl”) in the end of the jacket to keep it from chafing the conductor.