Quote:
Originally Posted by jyl
Maybe he's overstating. But the problem is the PO finished the whole basement, so nothing is accessible, they'd have to rip out multiple rooms down there to re-pour.
|
Then his contractor has a point, go at it from the outside shear panels on eterior and hope for no damages to the interior rooms, but that's highly unlikely. Drawings and stamps are his friends.