Update:
Havent done too much over the past month or so, waiting on funds to magically appear in my account!
Cabin is all dried in.
Have power; 3 power circuits and 1 lighting circuit so far.
Have a functioning toilet!!
Inner walls framed in.
Soffit, fascia, and gutters were installed over the weekend.
Next steps:
Frame in glass in gable above sliding doors.
Have glass installed.
Siding.
Then chip away at the rest of the electrical and plumbing to get final inspection.