|
Stijn!!
Sid, all construction projects are like that. I fixed up the bathroom at my old bachelor pad house. Started with just replacing a toilet. That morphed into ripping out everything but the ceilings. Down to studs on the wall and new sub floor and floor, shower, sink and everything. A total gut.
__________________
Glen
49 Year member of the Porsche Club of America
1985 911 Carrera; 2017 Macan
1986 El Camino with Fuel Injected 350 Crate Engine
My Motto: I will never be too old to have a happy childhood!
|