|
Registered
Join Date: Jun 2010
Location: Hudson Valley NY
Posts: 728
|
915:
CMS Invoice
Date
3/29/2011
915 V8 mid engine
1 basic rebuild labor: includes teardown, inspection, cleaning, re-assembly
1 915/930 4 point main shaft bearing
1 915 pinion shaft 4 point thrust bearing
2 diff thrust bearing
1 915 1st gear synchro ring
1 915 2nd gear synchro ring 11
3 901 1st-5th & 915 3rd-5th synchro ring
1 30x1.5 Shoulder Nut (input shaft)
1 915 lock nut, pinion shaft
1 trans hardware
1 Shop Supplies 25
1 Sealant 5
1 915 gasket set
free gasket set promotion -
1 915/930 1st/2nd shift sleeve
1 915/930 3rd/4th shift sleeve 29
1 915 1st gear dog ring (asymmetrical)
1 915 3rd gear dog ring 19
1 repair bell housing bore
1 reverse light switch
1 915/930 Pinion Shaft Cyl. Roller Bearing in bell housing, rear
1 915 reverse "H" gear, good used
CMS Invoice
Date
3/29/2011
Optional upgrades:
1 OSG LSD
Diff setup labor (if LSD is added)
1 tall 4th gear 0.86
1 tall 5th gear 0.68
1 CMS billet bearing plate
1 CMS billet side plate
1 119 Setrab oil cooler, 6x19 row, with electric fan (cooler size 5 3/4 H x 8 1/4
W x 19 rows)
1 Peterson 600 series billet oil filter W ITHOUT TEMP PORT, 153.30 153.30T
1 CMS internal spray bar 495.00 495.00T
1 Tilton transmission oil pump 228.00 228.00T
2 AN adapter, 3/8, -8, male 0.00 0.00T
1 Cooler Fitting -8 0.00 0.00T
1 Cooler Fitting -6
1 915/930 pinion setup shim .15 9.16 9.16T
1 915/930 pinion setup shim .20 9.88 9.88T
__________________
1989 911 LS1
Last edited by Yan2947; 03-01-2019 at 03:55 AM..
|