Any tips on sequencing my first engine installation? Or, advice on things to double-check before starting?
My thought has been to install the engine before the shocks, brakes, cv joints, engine skirts, or heater hoses – thinking this will leave more room to work. If that’s not right, let me know!
There’s still some details to attend to before I install the motor in my 1979 SC (was sent two left side heater hose clamps and waiting for the right side to arrive) but I’m getting close. If there’s a ‘better/best’ way to do any of this, please chime in!
BTW, I tried a search on 'engine installation' and into page 6 of the query results, I didn't have any 'hits.' Maybe I don't know how to use the search function?!