|
Registered
Join Date: Apr 2013
Location: Nevada City, Ca
Posts: 2,254
|
Quote:
Originally Posted by kach22i
Lags can work loose.
Anyway to get thru-bolts and flashing in there?
|
No rim joist. Truss joists. 3/8 shear. Only way was to lag into studs. This is what I used.
https://resourcefulsupply.com/each-simpson-strong-tie-strong-drive-sds-ledger-deck-screw-pc-x-wood-screw-123890317?gclid=EAIaIQobChMIrr3ZpJmU4wIV27XACh1FJg ksEAQYFCABEgKmyvD_BwE
|