2007 185 Skywagon work.
All assembly and test done myself after sending: 1. Engine to Western Skyways for overhaul 2. Prop to a local shop for inspection 3. Avionics upgrade designed by and bought from American Avionics. Wiring installation, termination and documentation completed by myself. Corrosion control rework of tail assembly completed by myself and one assistant. 14 months downtime.
Panel vintage 1981

Engine removed - discovered bad cam during first annual

O/H engine arrives, is unpacked. Prop back in shop

Engine reinstalled

Panel stripped