|
The old Victorian house we had in Upstate NY had been built in 3 distinct phases long ago. We had a new oak floor put down and had 2 transitions to deal with, plus the kitchen floor. The flooring contractor used a sanding machine to take the subfloor down slightly to match each section. It was laid at a right angle to the transitions and you couldn't tell that there was ever an issue. This guy was a real craftsman.
|