|
AutoBahned
Join Date: Jul 2007
Location: Greater Metropolitan Nimrod, Orygun
Posts: 55,993
|
the easiest is to use the pre-cut plywood 'forms' - they have some curves built up on them to hold the tubing bends - dunno if suitable for a concrete pour
it is not hard to place the tubing - I did it overhead after ripping out the ceiling (with helpers); the used reflective thin Al sheets to hold it n place and reflect some heat upwards - your task is a lot easier
|