|
Just a thought. All that power is sitting in one single box.
One MB. One PSU(which must be in the kilowatts). One wall plug.
One thing to lose a lot of expensive data.
Any future RAID or parallel plans or whatever would cut down processing times?
29 or even 11 hours x 15 steps seems to be a lot of time depending.
Last edited by john70t; 12-09-2019 at 12:04 PM..
|