Quote:
Originally Posted by madcorgi
The step down was because there was a lot of vegetation in the soil at the original level in that area, so he went down another foot. That will get filled in so the slab is level.
|
Makes sense. Dig down to sturdy soil then fill with lifts (make sure they do it in lifts where they compact, then add stone, then compact) of stone then pour.