Quote:
Originally Posted by rfuerst911sc
I am going to run a perimeter of 2x's at the bottom starting at the highest point . That 2x will be set with about 2 " exposed above grade then the balance of the perimeter boards will be set level . Then I will set 6x6's level and inside of the perimeter boards and all will be screwed together and staked into the ground.
|
Any chance of a concrete perimeter? Pressure treated 6x6s will last several years, but not nearly as permanent as concrete.