Quote:
Originally Posted by javadog
I would have put the main electrical feeder below grade. I usually go at least three feet deep.
I wouldn't tun any electrical through the slab, I'd run it all overhead, so it could be moved or modified later.
Your garage, feel free to ignore my advice.
|
I would have put the main electrical feeder below grade. I usually go at least three feet deep.
In Calif, we would go at least 14" of cover.
NEVER PUT CONDUIT OR PIPE IN THE SLAB. JFC fire your GC