Thread: Dug a hole
View Single Post
rusnak rusnak is offline
Registered
 
Join Date: Oct 2004
Posts: 15,612
Quote:
Originally Posted by javadog View Post
I would have put the main electrical feeder below grade. I usually go at least three feet deep.

I wouldn't tun any electrical through the slab, I'd run it all overhead, so it could be moved or modified later.

Your garage, feel free to ignore my advice.
I would have put the main electrical feeder below grade. I usually go at least three feet deep.

In Calif, we would go at least 14" of cover.

NEVER PUT CONDUIT OR PIPE IN THE SLAB. JFC fire your GC
Old 12-29-2019, 03:03 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #91 (permalink)