You guys are getting things done! It's been too cold and/or wet to do anything outside, but I did get a couple of projects taken care of. Both have priorities for MrsWD for the past 2 years.

We took some cabinet bases out in early 2018, just after we moved in. I finally got around to installing some tile in the space it left. I still have to fill the seams and nail in a new piece of baseboard.
The space above and behind the washer and dryer was ugly and things kept falling back there. MrsWD as been complaining about it for 2 years.
I made a shelf, 7 1/2" deep, 53" long, with a 6" panel to close the front.
The shelf had to be easily removable, so I ripped a 2x4 down to make a French Cleat to hang the shelf on.
All done!