Quote:
Originally Posted by cabmando
Looks great! I thought that initially you were going to install a 2 post. That get put on the side burner?
|
Not sure I need it. I can do 90% of the stuff I do with the low rise scissor, and I don't like how much real estate permanent lifts take. Plus I keep changing my mind on where everythng should go. This is about the fourth different arrangement.