|
Registered
Join Date: Nov 2003
Location: South West Florida
Posts: 2,527
|
Hopefully in a few weeks the floors will be done and we can move some of our furniture in. I need to call the cabinet company and see where they are. The cabinets are supposed to be done, but I haven’t heard from them. Once the cabinets are in it will be a week or two before the countertops are installed.
My bank account is getting hit pretty hard, the wife spends most of the day ordering stuff.
__________________
2000 Boxster S (gone)
1972 911s Targa (sold)
1971 911t coupe roller (sold)
1973 911t coupe / 3.2 (sold)
Gruppe B #057
|