|
Platinum Member
Join Date: Jul 2001
Location: Leave the gun. Take the cannoli.
Posts: 21,302
|
Get the leaves away. Pitch dirt away and make sure there is at least 8" from siding down to grade. Fix Gutters & downspouts, clear and terminate away from the foundation.
I'd pull down the inside paneling first. If the T1-11 is sound, it can serve as sheathing for new siding.
The steps really don't bother me. Plant a few shrubs?
How bad is the slab? Moisture may be coming up through it.
__________________
Political polls are often to give you an opinion, not to find out what your opinion is - Scott Adams
|