Quote:
Originally Posted by 73.5TinPA
Starting to review some invoices.
You guys are a hoot.
Here's the engine rebuild invoice from 8/29/78.
This service manager must have had a tough time in penmanship in first grade.
Looks like:
3 new pistons
clutch set
3 rings/1 kit;
set rod bearings;
1 intermediate shaft;
6 chain guides;
2 tensioners;
1 sprocket;
3 valves;
3 rockers;
1 oil pump;
I can't make out the rest. Total Labor 1173; total parts 3206; total bill 4632.
|
The RS rebuild on my 72T cost about this much in 1988. Either my guy got a great deal or your guy got ripped. I think the latter.
__________________
1978 SC Coupe, Gris Argent Metallic Silver
1988 FJ62 Blue/Gray
2020 M2 CS
|