|
Just remember that new posts will probably want to sink a bit at first, and pull attached structure such as the house with it.
Boxed steel is much stronger.
U-Channel is open and tends to dig itself into the ground. Be warned.
You could weld brace tabs on later I suppose. Cut them fashionable.
Any vertical posts should sit on top of concrete-filled sono-tubes 4' below ground at the very least in frost/cold zones.
Something solid. Foundation is everything.
There will still be some minor shifting though.
__________________
Meanwhile other things are still happening.
Last edited by john70t; 08-29-2020 at 10:39 PM..
|