Quote:
Originally Posted by jyl
I’d think that an extra 2’ underground will be more helpful than extra cement. How about getting a sleeve for the sleeve, augering down 5’, and really planting that sucker deep? The effort of augering an extra 2’ is probably less than the effort of mixing and pouring a bunch more cement.
|
I should have no problem augering down as I have a gas powered auger that works great.