Quote:
Originally Posted by IXXI_carrera
Timely thread for me. We are building a new home and want to plan for wiring (cut-over switch) now and perhaps add a generator later. It'll be connected to natural gas.
Appreciate input for our planning. Now is the time since we are in the design stages.
|
Make sure the mechanical room is of generous size and
don't finish the ceiling. I would not finish the wall around the breaker box either. It's a huge PITA to have to work in a room where all the plumbing and wiring is behind drywall.