Originally Posted by IXXI_carrera View Post
Timely thread for me. We are building a new home and want to plan for wiring (cut-over switch) now and perhaps add a generator later. It'll be connected to natural gas.

Appreciate input for our planning. Now is the time since we are in the design stages.
Make sure the mechanical room is of generous size and don't finish the ceiling. I would not finish the wall around the breaker box either. It's a huge PITA to have to work in a room where all the plumbing and wiring is behind drywall.