|
Box for sunken scissor lift
Pouring concrete soon and we are putting in a box so the scissor lift is flush with the floor. Also going to put in PVC tubing to run the hydraulic lines to the side of the shop.
Anyone done this and have dos and don'ts? Anything you wish you had done or had to go back and do? I'm guessing box dimensions should be 1" on each side larger than the lift.
__________________
Tru6 Restoration & Design
|