As of Friday afternoon, 20 of 21 windows were installed, caulked and sealed. All of the old siding is off except for one side of the back porch and most of the outside corners, inside corners, starting strips and "J" mouldings are installed. About 20% of the siding is in place. Starting Monday, the project manager will have his full crew on site to hit the siding install hard and heavy. Except for the window that had to be re-ordered because it was the wrong size, the rest of the house should be done. There is a bit of renovating to be done inside the back porch but I don't think that will take more than 2-3 days at most. Meanwhile, I've been putting blinds and curtains back up and moving furniture back into place. With a little luck, we will actually get to decorate for Christmas this year! The beat goes on!