Quote:
Originally Posted by Alan A
Work 8-10 hours.
10 minutes with a sawzall.
Criminal math.
|
10 minutes?
in 10 minutes they rip out 3-4 cats
check this out, it's not that they are clever about it, they aren't even efficient.
1 guy does all the work
gone in 60 seconds
The key is they go for models they know well, that they know have good access, they know what side to access, etc etc