|
Registered
Join Date: Apr 2001
Location: Linn County, Oregon
Posts: 48,916
|
Mine was easy to build, once I figured the location I wanted.
next step...home depot, get the tough shed order forms.
Then contractor hired to gravel and level the footprint.
Final step, sit in a folding chair and watch a team of young skilled guys install the shed in about 4 hours. Tipped the guys before they left.
Why the Home Depot sold tough shed? They use a rot proof galvanized metal framework for the foundation. Worried about the wood foundation used by the other brand rotting in our wet climate.
__________________
"Now, to put a water-cooled engine in the rear and to have a radiator in the front, that's not very intelligent."
-Ferry Porsche (PANO, Oct. '73) (I, Paul D. have loved this quote since 1973. It will remain as long as I post here.)
|