View Single Post
look 171 look 171 is online now
Registered
 
Join Date: Mar 2004
Location: Los Angeles
Posts: 17,705
Personally, I take all the sub floor out and replace with 3/4" plywood. Glue, and nail to joist. You will have a great stiff floor through out and level too. If not, use self leveling compound to take care of the dips. Block off floor joist if you have it all open. That's just me being anal and I do this all day with client's floor once opened up. Its much better work. In your situation, you shoud be able to get away with just stripping off the sub floor under the linoleum. Dealing with that glue is a btich. Easier to just remove the sub floor.
Old 03-30-2021, 01:58 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #2 (permalink)