|
Ah, I see what you want now. Thing is, I would have done what Dad911 said, use the sub top until the quartz tops is ready to be installed. 10 days? If done that way, installer can get accurate measurements and no jiggling the sink around to make for a perfect fit. I am not liking the 2x cleat holding up the sink. That sink filled up with water is heavy. A few screws into 3/4" plywood (or particle board?) side makes a contractor like me think about potential law suits in the future if things get worn or goes bad. Sink needs to be flush with top of plywood.
|