After six weeks of dust, chaos, and inconvenience of living out of cardboard boxes the bathroom is pretty much finished. The contractor left today and won't be back until the new cabinet doors or the new shower door arrive. We have a little touch-up painting to do around the thermostat for the floor heater. Yayyyy!!
The American Standard dual flush toilet wasn't assembled properly from the factory. It was on hold for 45 minutes but finally a human at AS customer service came on the line. She talked me through fixing it. It was a simple fix, but I'm skeptical of this thing. I got it because water is so expensive out here (but electricity is cheap). Last month our electric bill was $120 and my water bill was $69.
MrsWD loves storage. Turning the hallway to the closet into a big storage space was a great move.
One panel on the cabinetry matches the look of the showroom sample. The salesman didn't even hesitate, he agreed the cabinets should look like the sample we ordered from.
The cabinets they sent look like crap. New doors and drawer fronts will take a couple of months to come in. We'll use duct tape for handles until then.