View Single Post
stomachmonkey stomachmonkey is offline
The Unsettler
 
stomachmonkey's Avatar
 
Join Date: Dec 2002
Location: Lantanna TX
Posts: 23,885
Send a message via AIM to stomachmonkey
Quote:
Originally Posted by Steve Carlton View Post
How many guys do you get (or need) for $400/hour? There's got to be other overhead expenses in there as well, right? Are the 10 x 20 and 5 x 20 sections in one piece?
Well that's my issue.

The materials are not itemized so I have no idea what else is required beyond the sheets although researching manufacturer recommended installation guides shows that yeah, there is more to it than the sheets. Begs the question, will he be following their guidelines or just "doing it the way he does it"?

The two sections are in one piece, rectangles, nothing fancy, no elevation changes, fancy compound curves, just straight up rectangles.

The stuff comes in a variety of sizes up to 6x9 from what I've seen so 3 sheets for the smaller space and maybe 6 or so of a different size for the larger space.

I've never done it before myself but I'm having a really hard time seeing it being 8 hours of work for two guys.
__________________
"I want my two dollars"
"Goodbye and thanks for the fish"
"Proud Member and Supporter of the YWL"
"Brandon Won"
Old 04-08-2021, 09:24 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #8 (permalink)